Our policy at S.B.S engineered solutions set the measures and standards of our extensive service provided to our clients and customers. To ensure all required aspects to meet those standards, we undertake deliver to all our employees and workmanship among our organization the highest level for in house training sessions, conductive seminars for quality service & technical field training. Our management system shall implement quality assurance and quality control procedures that ensures the delivery of our services to be provided at a professional level.
Similar to most Quality manual standards, quality manuals are reviewed annually by Quality Managers in relevance to the performance of their departments towards means of developing systematic procedures upon need.
Taking team work as a lead, it is advised to share suggestions that shall be forwarded to Quality Managers for consideration and submitting the same to the General Manager for signed approval before issue.
The Re –issue is the result of any changes taking place as it must be updated in the complete manual and indicated in the revision on the cover page of the Manual.
Revised Manuals shall be distributed to all concerned holding controlled copies, while absolute copies shall be returned to the Quality Manager for cancellation and disposal process.
Controlled Quality Assurance Manual holders shall be maintained by the Quality Manager. Listing for those is hereafter:
Management
Authority Responsibility Organization Review
Responsibilities / Authorities
Title |
Description |
Director |
A member of the Board of Directors that manages the organization |
General Manager |
Holds Overall responsibility for Quality |
Senior Manager |
Execute General Manager procedures with limitation to their authorities & activities |
Quality Manager |
Ensure compliance with quality requirements to all projects by structuring the quality system among relevant procedures,. Quality Manager does not only receive QA/QC reports but ensure to take action to resolve issues related to Quality |
QA/QC Engineer |
Monitor Quality activities on projects and enjoys direct responsibility towards Quality Manager |
Quality Auditor |
Responsible towards Quality Manager in means of internal/external audit |
Resident Engineer |
Being resident on site, the Resident Engineer enjoys responsibility for all project activities |
Contract review
Tender Stage Requirement
Adequate Changes Documentation
Client Organization Queries for Resolution
Contract Record Review
Adequate Capability towards Contract Requirement
Document control
Document Allocation Record
Implementation of Written Record
Identification of Document for Disposal
Maintain Documentation Record
Document Authorization by Source
Written Notification for Queries
Controlled Document Distribution
Mobilization.
Quality Plan.
Management Quality System
Tender Stage Programs
Awarded Contract Program Assessment
Quality records are maintained to provide formal recording for contract/project status in accordance to QA/QC project requirement standards. Quality records are maintained to demonstrate the achievement of the required quality and the effective operation of the Company’s quality system
Essential methods are listed herein:
Supplied products must comply with requirement of Quality Plan. Pre caution methods are considered for handling & delivery process, as well as storage facility that must allow consideration for product storage requirement as per manufacturer instructions and standards.
Based on Auditing concept, Internal Audit is to ensure continued compliance to organization Quality Plan and it shall include training for staff upon the activity of each audit. Audits require substantiation and objective evidence of the examples examined to demonstrate that the required procedures are being implemented.
Project Quality Records must include Internal Audit results and should be submitted for management review.
By covering demonstrated external areas of suppliers and subcontractors, the assessment to perform up to Quality Assurance standard is accredited by third party meeting QA/QC requirement. External Audits are conducted at the premises of supplier or subcontractor and are performed by skilled personnel meeting organization procedures.
Despite of the skilled personnel capacity and knowledge level, it is essential to provide proper training sessions to acquire the relevant status during the career development of the individual.
This will develop individual tasks and assess their competence in their job. All sorts of trainings provided shall be recorded.
Extensive service and support results from continued training sessions to individuals that will motivate and generate better outcome for the business overall.